One filter bay. Two heavy vacuum trucks. Sand base untouched.
That was the brief when Great Western Water needed the spent granular activated carbon (GAC) removed from a filtration bay at their Gisborne facility. Take out the entire GAC layer, leave the sand base completely undisturbed, and turn the bay around so replacement media could go in the same week. We delivered all of it, from extraction through to EPA disposal and placing the new media.
Here’s how we did it, and why controlling the vacuum made the difference.
Project at a Glance
- Client: Great Western Water
- Site: Water filtration facility, Gisborne VIC
- Scope: Remove spent GAC from the filtration bay, then place and level replacement media
- Constraint: No disturbance to the sand base beneath the GAC
- Equipment: Two heavy vacuum units working in parallel
- Waste: Classified, transported and disposed of at a licensed EPA facility
- Safety: Delivered to our documented Safe Work Method Statement (SWMS)
Why the Sand Base Is the Real Risk
Filter media change-outs are routine maintenance across water treatment. Taking the old media out is the easy part. Protecting the sand base underneath is where these jobs go wrong.
GAC and sand behave very differently under a vacuum head. GAC is coarse, angular and relatively loose. The sand beneath is finer, more mobile, and easily disrupted by aggressive suction or a poorly angled nozzle.
On a filtration bay, that base does more than hold things up. It’s part of the treatment process. Even minor disturbance can mean re-levelling, re-certifying and a delayed return to service.
Why Heavy Vacuum Was the Right Fit
Mechanical removal wasn’t an option. It carried too much impact risk, needed too much labour inside a confined bay, and gave no clean way to control depth as the crew worked down through the material.
Our heavy vacuum units let the operator control extraction depth in real time. With the suction set correctly, the GAC lifts cleanly and the base layer stays put. No shovel, no digger arm, no mechanical contact with the substrate. It’s the same principle behind our non-destructive digging around live services, applied to high-volume vacuum loading.
For a bay this size we ran two trucks in parallel. The crew could work continuously without waiting on tank capacity, and total time on site was roughly halved compared to a single-truck approach.
How the Job Ran
Two operators worked the bay at the same time, moving methodically across the surface. Vacuum pressure was dialled in to lift the GAC without pulling sand up with it, and depth was checked progressively rather than assumed.
The bay involved confined space entry, working at heights and material that required respirators. Our SWMS was prepared and signed off before anyone entered, and all crew worked in full PPE with harnesses and airway protection.

All spent GAC was tanked out and delivered to a licensed EPA facility. We handled the classification, transport and disposal ourselves, so Great Western Water didn’t need a separate waste contractor.
Once the bay was clear and inspected, a crane crew lifted bulk bags of new GAC into the pit. Our crew then spread and levelled the replacement media to specification, keeping the layer uniform across the bay.
The Result

- All spent GAC removed from the filtration bay
- Sand base left untouched, with no re-levelling or re-certification needed
- Replacement media placed and levelled to specification
- Facility returned to service on schedule
This was our first project directly for Great Western Water, and we’d welcome the chance to support future filter maintenance across their network.
One Contractor for the Full Change-Out
Two things consistently blow out scope and budget on filter media jobs. The first is damage to the base layer during extraction. The second is fragmented delivery, with one contractor for removal, another for waste, another for placement, and the utility left to coordinate all of them.
Controlled heavy vacuum extraction deals with the first. A single scope covering removal, waste and replacement deals with the second. Our industrial waste management and liquid waste removal services cover the disposal side on any water utility maintenance program.