One sediment pond. One working week. Almost no added water.
That was the brief when a sewer treatment plant at a Yarra Valley waste facility needed a sediment pond emptied. We came on as sub-contractor to deliver the cleanout and finished on schedule, using our 10,500L heavy vacuum units to lift the sediment straight out of the pond.
Here’s how we did it, and why the equipment choice made the difference.
Project at a Glance
-
- Site: Sewer treatment plant, Yarra Valley waste facility
-
- Our role: Sub-contractor for the cleanout works
-
- Scope: Remove all accumulated sediment and waste from the pond
-
- Constraint: Minimal water use during removal
-
- Equipment: 10,500L heavy vacuum units
-
- Duration: One working week
-
- Safety: Delivered to our documented Safe Work Method Statement (SWMS)
The Problem With Adding Water to a Waste Pond
Sediment ponds fill up with fine silt, organic matter and settled waste. Over time that build-up eats into the pond’s capacity until it stops doing its job. Cleaning them out is routine maintenance for any wastewater site.
The common approach is to pump in fresh water, turn the sediment into slurry, then pump it out. It works, but it has a cost that’s easy to miss. Every litre of water you add becomes waste. It has to be classified, carted and paid for at the receival facility.
On a sediment pond, the whole point is to take waste out. Adding thousands of litres of water just creates more of it. So the client needed a method that could lift the sediment as it sat.
Why a Standard Vac Truck Wasn’t the Answer
Most vacuum trucks on the road are built for non-destructive digging. A water lance breaks up the ground and the vacuum pulls out the slurry. That’s ideal for exposing underground services safely. It’s the wrong tool for bulk sediment. It depends on water, and the tanks are sized for potholing, not for emptying a pond.
Our heavy vacuum units are a different class of truck. They’re set up for high-volume vacuum loading of dry and semi-dry material, with 10,500L tanks and enough suction to lift heavy sediment directly. No slurrying first. No wash-down. No extra waste volume for the client to pay to dispose of.
How the Week Ran
The job ran as a simple cycle. The crew worked the pond from the working level and fed sediment straight into the tank. Once a truck was full, it hauled the load to a licensed receival facility, tipped, and came back for the next one.
The site itself needed careful planning. There were elevated tank walls, restricted access down to the working level, and hazardous material to handle. All of it was worked through before we arrived. Our SWMS covered confined space entry, working at heights and PPE requirements from day one, and the crew worked to it for the full week.
Every load was weighed, classified and disposed of at an appropriate facility, with documentation handed to the client for their asset and environmental compliance records.

The Result
-
- Pond fully emptied within the scheduled week
-
- Minimal water added to the system
-
- No safety or environmental incidents
-
- Pond returned to full working capacity, with plant operations back to normal
Keeping water out of the process also kept the waste volume down. For the client, that meant fewer loads and lower disposal costs than a slurry-based cleanout would have produced.
Where Else This Approach Works
The same trucks and method suit any job where bulk material has to come out of a tight or hazardous space without making more waste. We use them for:
-
- Sediment ponds on scheduled maintenance cycles
-
- Clarifiers and settlement tanks needing sludge removal
-
- Grease traps at commercial and industrial scale
-
- Below-ground sumps, wet wells and industrial receivals
-
- Silos and bulk material recovery
-
- Any job that calls for dry or semi-dry vacuum recovery
Our clients here include water utilities, wastewater treatment plants, food processing sites and heavy industry. If your site produces waste that needs regular removal, our industrial waste management and liquid waste removal services cover the rest.
Built to Work Under Head Contractors
A lot of our work comes through head contractors running utility and industrial maintenance programs. We know what that relationship needs. Our crews are trained and certified for confined space, working at heights and hazardous material environments. We turn up with a documented SWMS, keep to the program, and hand over the disposal records you need for close-out.
And if the same program needs services exposed or pipes inspected, our NDD and CCTV crews can come from the same fleet. One sub-contractor, fewer handovers.
Got a Cleanout Coming Up?
Whether the job is locked in or you’re still scoping it before tender, we can walk the site with you and recommend the right unit, crew size and approach. It’s quicker to get it right at the planning stage than to fix it on the day.