Precision Hydro Excavations was entrusted with the critical task of managing a deep sewer pit for a new housing estate that had not yet been connected to the main system. The pit, at over 12 meters deep, required the use of our high-capacity 10,500-liter heavy vacuum truck to maintain efficient waste management. In conjunction with our 22,000-liter semi vacuum truck, our skilled crew managed the flow from the manhole around the clock, operating 7 days a week.
This project was essential to prevent any disruptions for the 2,000 homes relying on the unconnected line. Our team was responsible for safely transporting waste to an approved disposal facility located just 20 minutes away. Over the course of seven months, we successfully managed daily waste volumes exceeding 150,000 liters—all without any incidents.
Our client’s trust in us to handle such a critical responsibility was well-placed, and we delivered a seamless service, thanks to our top-tier equipment and expert team. The project was completed with full accountability, safety, and reliability, ensuring uninterrupted service for the estate’s future residents.